Rod just left for McBride today (Wed.) And i know he was eager to get things started. But that means building the trails first and that takes about 4-5 days if everything goes good. I'll go out on a limb and say all trails will be ready by Dec. 11 or 12th. Flygirl will know for sure since she looks after things for Hotrod and Barry will know also. Higgins.