Its been 3 1/2 weeks over here now and the job is done. We drilled an Underbalanced oil/gas well that was a bear to drill, big fractures, with high flow rates, and green crews. We flow tested once finished drilling it flowed 24,000 bbls/day and 19mmscf/day it could of flowed more but limited do to surface equipment.
About 10 days ago it started raining and rained for 4 days straight we had about 6-8inches of water on location, and many people down in the valley died from flash flooding...homes wipes out.....mind you they are made of clay not the best building material when it rains. It was the biggest rain in Yemen since 1969. What a sight seeing rats running for high ground!!
Hope to get out for a ride while I am home, started the snow dance...hope it works!!:d
About 10 days ago it started raining and rained for 4 days straight we had about 6-8inches of water on location, and many people down in the valley died from flash flooding...homes wipes out.....mind you they are made of clay not the best building material when it rains. It was the biggest rain in Yemen since 1969. What a sight seeing rats running for high ground!!
Hope to get out for a ride while I am home, started the snow dance...hope it works!!:d