I placed a 4' 1x4 across the studs on the shop wall. Measured and put in 4 3" screws that seem to work just fine. The handle on the front clamps work well and I drilled a couple holes (big enough for the screw heads to go through) in the rear ones under the clamping mechanism. I'll put up a picture later.
I have a design I want to make based on the Triton ski tie down holders. Anyone know of a good aluminum fab shop in CGY they would like to recommend? Also need to fix the track extension for the sled deck.
Here’s a side shot, can get more or better ones when I get it back from being wrapped.
The aluminum tube is from extra dock legs that I had, welded them together, can self tap screw them together as well, pre drill a hole through the top one that’s stacked and lag em into the wall stud.
Trailer is a Trails West Burandt Edition that we’ve added a ton of things to. After we welded up all the floor cross members and put some extra gussets in trailers been a gem. Have to admit this thing gets pulled everywhere at a buck twenty five all winter and has primarily hauled four big turbo sleds around all winter.
Can post some more things that I did into the enclosed thread, but can’t find it on Tapatalk...so since it’s Saturday thought you guys might wanna do some fabrication yet this weekend!