mew pipe install

steven2120

Active VIP Member
Joined
Oct 10, 2009
Messages
452
Reaction score
5
Location
Grande Cache
new pipe install

so i just installed my new reeds and i was gonna work on my pipe and y pipe, but im just wondering, do i need to remove the stock studs or can i leave them in? if i need to remove them what is the best method? also should i run a thin bead of gasket sealer around my y pipe?

forgot to mention its a slp pipe install
 
Top Bottom