Thedoityouselfguy
Active member
Got the sides back from my friends at Hydrosion water jet services. I think the idea here will be to make everything rivet together including the grab bar at the rear. This should make shipping a little less expensive for you guys. 1" tube outer and 3/4" inner tube construction running boards will also be included with the kit. All individual pieces will also be available for sale in the event that you have a bad roll and can get away with a couple replacement parts. Here is a taste of how the extension will look with the tip up.
Last edited: