Tunnel stiffener/extension/bumper kit project is taking shape

Thedoityouselfguy

Active member
Joined
Jan 15, 2013
Messages
147
Reaction score
88
Location
Westlock
Got the sides back from my friends at Hydrosion water jet services. I think the idea here will be to make everything rivet together including the grab bar at the rear. This should make shipping a little less expensive for you guys. 1" tube outer and 3/4" inner tube construction running boards will also be included with the kit. All individual pieces will also be available for sale in the event that you have a bad roll and can get away with a couple replacement parts. Here is a taste of how the extension will look with the tip up.
nytro ext 2.jpg nytro extension.jpg
 
Last edited:
Top Bottom