So I'm perplexed, looking at building a shop , 40x40 with two side 12x40 open storage bays

I've got two quotes that are outrageous for prices in wood framed 130-160000.00 , which includes the pad and footings

Looked at a metal 42x44 commercial building ( 80000.00 ), but then would have to build the side storage bays extra like pole sheds , and wood walls inside with insulation, work benches , plywood to hang stuff on walls ect , plus the pad and footings cost


160000.00 for a garage is crazy is it not ???


Need advice , know there was a thread I kinda lost where it went

Screenshot_20211029-130731_Facebook.jpg
 

Rn4

Active member
Joined
Dec 16, 2018
Messages
92
Reaction score
339
Location
Alberta
It’s honestly just gross what costs are. I had premium built structures out of red deer build me a pole shed early this summer. It was 30x40x14’ with 6” concrete, manual 12’ overhead door. I’ve got basic power and lights in it, no insulation. Probably sitting at about 75-80k. Will pluck away at the rest at my own pace since I can’t dump loads of money at it to fI is hit right away. But they were one of the better quotes I came across.
 

Frosty19

Active VIP Member
Joined
Jun 20, 2013
Messages
360
Reaction score
594
Location
Saskatchewan
Todays prices, that doesn't seem far off being $100 a sqft with foundation depending if that's fully finished. That also makes the extra roof and structure for the lean toos throw ins
 

niner

Active VIP Member
Joined
Mar 14, 2009
Messages
8,093
Reaction score
57,702
Location
lacombe
So I'm perplexed, looking at building a shop , 40x40 with two side 12x40 open storage bays

I've got two quotes that are outrageous for prices in wood framed 130-160000.00 , which includes the pad and footings

Looked at a metal 42x44 commercial building ( 80000.00 ), but then would have to build the side storage bays extra like pole sheds , and wood walls inside with insulation, work benches , plywood to hang stuff on walls ect , plus the pad and footings cost


160000.00 for a garage is crazy is it not ???


Need advice , know there was a thread I kinda lost where it went

View attachment 249664
Should price out a 40x60 and ditch the sides. Will be less labour to build one single building than adding the sides. Then you will have more inside storage. Can always do a inside partition if you want cold storage. Just a thought to get more bang for your buck.
 

tex78

Active VIP Member
Joined
Feb 5, 2010
Messages
17,517
Reaction score
16,887
Location
DA Moose B.C
Should price out a 40x60 and ditch the sides. Will be less labour to build one single building than adding the sides. Then you will have more inside storage. Can always do a inside partition if you want cold storage. Just a thought to get more bang for your buck.
Huh something to think about

Tough to back trailers in , unless there is a separate entrance , for the cold storage
 

SUMMIT TREE

Active VIP Member
Joined
Oct 20, 2012
Messages
2,099
Reaction score
8,469
Location
Bonnyville AB Canada
Back in the day when I was looking, I found a deal on a metal building package. It had been ordered and a down payment was made on it, but the deal fell thru. I could have picked it up for a heck of a discount. If you shop around maybe you could find similar deals?
 

tex78

Active VIP Member
Joined
Feb 5, 2010
Messages
17,517
Reaction score
16,887
Location
DA Moose B.C
Back in the day when I was looking, I found a deal on a metal building package. It had been ordered and a down payment was made on it, but the deal fell thru. I could have picked it up for a heck of a discount. If you shop around maybe you could find similar deals?
I talked to a different metal building company tonight , after my post here

Csd buildings , outa golden



Very helpful guy , probably enough I'll go with them


He said you have to watch, lots of places have different slow load specs

So say your from mission and order one , don't get it and they are stuck with it


Now you ( not the first dude ) buy it a big discount, get it either put up or ready to with footings and such


Then find out the engineering specs don't pass for the area your in , say revelstoke as example

Now your stuck with it or won't pass inspection, and can not get insurance
 

SUMMIT TREE

Active VIP Member
Joined
Oct 20, 2012
Messages
2,099
Reaction score
8,469
Location
Bonnyville AB Canada
yeah. That could be a real issue. My neighbour has a huge riding arena with the roof collapsed in right now. Im sure it will be a huge court battle.
 

skegpro

Active VIP Member
Joined
May 11, 2009
Messages
9,930
Reaction score
21,329
Location
In them hills.
So I'm perplexed, looking at building a shop , 40x40 with two side 12x40 open storage bays

I've got two quotes that are outrageous for prices in wood framed 130-160000.00 , which includes the pad and footings

Looked at a metal 42x44 commercial building ( 80000.00 ), but then would have to build the side storage bays extra like pole sheds , and wood walls inside with insulation, work benches , plywood to hang stuff on walls ect , plus the pad and footings cost


160000.00 for a garage is crazy is it not ???


Need advice , know there was a thread I kinda lost where it went

View attachment 249664
So why not just go a little bigger with the metal shop and have everything enclosed, no open bays.....
 

Frosty19

Active VIP Member
Joined
Jun 20, 2013
Messages
360
Reaction score
594
Location
Saskatchewan
Do prefab engineered not get reviewed for permit there?
We can barely build anything here without an engineered stamp. Seems pretty self explanatory for someone when signing off on a building if they loaded it for the proper snow zone
 

Absledder

Active VIP Member
Joined
Oct 29, 2013
Messages
753
Reaction score
666
Location
bonnyville
Yes be careful with local codes. They often make little sense in my experience. My brother in law put up a pole barn a few year ago and because he was "residential" at 9.98 acres he had to follow different rules then if he was "agricultural" at 10+ acres. Specifically I think he said he needed almost twice as many trusses due to the different spacing allowed. You'll also have to watch out for max square footage rules depending what other structures you have on the land
 

ctd

Active VIP Member
Joined
Dec 14, 2016
Messages
485
Reaction score
1,438
Location
In Elevation
Thinking about niner's comment, any prep that could be done @ the same time to add a side or sides @ a latter date?

Add an overhead door on the side were you actually may do a side @ a latter date. That overhead door would be opposite end of your main overhead door. Access to both ends of the building.

I don't see any mention of ceiling height, one of biggest regrets has been not having @ least one 14' overhead door.

Have you considered ICF? Fire, bugs rodents etc. never mind R factor & others. I'm starting to think about building shop & wondered what the cost is vs stick considering todays market.

Then there is tilt up, don't know if that is an option anymore.
 

tex78

Active VIP Member
Joined
Feb 5, 2010
Messages
17,517
Reaction score
16,887
Location
DA Moose B.C
Do prefab engineered not get reviewed for permit there?
We can barely build anything here without an engineered stamp. Seems pretty self explanatory for someone when signing off on a building if they loaded it for the proper snow zone
Yes , it will be built to spec for here , as it's not a left over
 

tex78

Active VIP Member
Joined
Feb 5, 2010
Messages
17,517
Reaction score
16,887
Location
DA Moose B.C
Thinking about niner's comment, any prep that could be done @ the same time to add a side or sides @ a latter date?

Add an overhead door on the side were you actually may do a side @ a latter date. That overhead door would be opposite end of your main overhead door. Access to both ends of the building.

I don't see any mention of ceiling height, one of biggest regrets has been not having @ least one 14' overhead door.

Have you considered ICF? Fire, bugs rodents etc. never mind R factor & others. I'm starting to think about building shop & wondered what the cost is vs stick considering todays market.

Then there is tilt up, don't know if that is an option anymore.

12 x12 door

14 foot walls , 16.6 at tip of peak

12 foot t rafters on inside , side storage bays


He said they can sonic tube the footings where each beam is , 6 big ones

I asked about cold and doing the deep insulated footings, he said not really needed or warmer if the base plates are done right
 

RXN

Active VIP Member
Joined
Feb 26, 2009
Messages
6,712
Reaction score
34,294
Location
Gibbons, Alberta, Canada
Stay away from the prefabbed steel buildings.
I went that way. Thought it was a cheaper option.
Nope.
I'm un insulated and into mine for just under 80.
And being no posts inside and selves and hooks or outlets on the walls are screwed through the wall and permanent now.
Neighbor built the same size, out of wood. He's insulated and heated at the same price I was.

40 long 30 wide. 16 at the peak. 8ft walls
 

tex78

Active VIP Member
Joined
Feb 5, 2010
Messages
17,517
Reaction score
16,887
Location
DA Moose B.C
Sounds like you need an Alaskan mill.

Just start bucking down some cedars & maker yourself. haha
Sold 7 loads off the property of fir


Thought of that , but needs time to dry and also needs to be manufactured wood for insurance purposes
 