Ministik Man
Active VIP Member
After clearing the parking lots at 4:00pm and the night was young we groomed the North section from Parking Lot #33 to the gravel road on the connector trail.
It was raining and posed some problems for the grooming but most of the humps and bumps were removed.
This took from 4:00pm to 12:30am or 8.5 hours run time and about 100 to 110 litres of Diesel.
It was raining and posed some problems for the grooming but most of the humps and bumps were removed.
This took from 4:00pm to 12:30am or 8.5 hours run time and about 100 to 110 litres of Diesel.